SpoonSeal
openingOne-time (per build-out/remodel)Boston

Building Permit — Boston (ISD)

Boston restaurant build-outs require an ISD building permit; a change of occupancy needs a long-form permit.

Official Source
City of Boston — Inspectional Services Department (Building Division)
https://www.boston.gov/departments/inspectional-services/permitting-and-licensing-boston

What it is. The building permit for construction, alteration, or tenant improvement of the space.

Who issues it. City of Boston — Inspectional Services Department (ISD), Building Division (City layer).

When you need it. Before construction/alteration. Using a building for something other than its current legal occupancy may require a long-form permit to change the occupancy.

How to apply. Submit through the ISD online permitting portal; schedule and pass inspections.

Fees. Per the ISD fee schedule — see source (⟢ VERIFY).

What SpoonSeal tracks. The document(s) you upload for this requirement, with automatic renewal/expiration tracking (Current, Due Soon, Expired). Where the city publishes health-inspection results (e.g., NYC and Chicago), SpoonSeal syncs them automatically; elsewhere they can be added manually.

References

Stay ahead of this requirement

SpoonSeal stores your documents, tracks expirations, and reminds you before anything lapses — so you are always inspection-ready.

Get started free →

This guide is informational and not legal advice. Always confirm current requirements with the official agency linked above.